Parrish

Graphic Packaging Expansion

Parrish and LS3P are in the finishing stages of this 205,000 SF expansion to the Graphic Packaging distribution center. The tilt-up concrete warehouse has a TPO roof and includes 2 interior buildouts for different teams including a break room, restrooms, and offices, 37 dock doors and dock levelers, a drive-in ramp, and a main office buildout for the Graphic Packaging team.